How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點擊重新得到驗證碼
主站蜘蛛池模板: 日韩精品无码免费一区二区三区| 久99久热只有精品国产15| 一区二区三区在线观看亚洲电影| 又湿又紧又大又爽又a视频| 伊人久久大香线焦av综合影院| 国产大量精品视频网站| 午夜无码福利伦利理免| 97碰成人国产免费公开视频| 成本人片无码中文字幕免费 | 亚洲精品久久国产精品浴池| 免费无遮挡在线观看网站| 亚洲综合另类小说色区大陆| 日韩新无码精品毛片| 亚洲国产制服丝袜无码av| 国产成人av综合久久| 亚洲精品国产av成拍色拍个| 亚洲а∨天堂男人色无码| 日韩av爽爽爽久久久久久| 国产乱人伦av在线a| 亚洲国产成人精品无码区在线网站| 国产成人亚洲综合网色欲网久下载| 精品伊人久久久99热这里只| 极品无码人妻巨屁股系列| 亚洲日韩欧美在线观看一区二区三区| 色一情一伦一区二区三| 亚洲精品久久久久久久观小说| 亚洲中文色欧另类欧美| 四虎国产精品免费永久在线| 在线观看一区二区三区国产免费| 人妻无码一区二区三区 tv| 国产亚洲精品a在线观看| 亚洲国产一区二区三区亚瑟| 欧美牲交videossexeso欧美| 亚洲人成在线观看网站不卡| 亚洲欧美一区久久牛牛| 亚韩无码av电影在线观看| 67194成在线观看免费| 国产美女露脸口爆吞精| 国产在线不卡一区二区三区| 无码熟妇人妻av影片在线| 精品亚洲国产成人av在线小说|